Automation · Instrumentation · Industrial electrical work

Industrial projects,
from field work to commissioning.

I work close to the equipment: understanding the process, coordinating work, programming systems, and supporting tests. Every project is an opportunity to make a line more reliable and easier to operate.

08industrial projects featured
3chapters: Morocco · Senegal · Québec, Canada
1 500m³/day, reported station capacity (2019)
From process to machine

Eight projects.
Practical challenges.

From complete installations to focused improvements, these projects show how I work: observe, understand, act, and verify in the field.

01Dakar · OLEOSEN · Oct 2022 – Mar 2023

From installation to line start-up.

OLEOSEN soap plant in Dakar: a 2,500 m² facility, reported investment above MAD 65 million and reported production capacity exceeding 30,000 tonnes per year. On-site assignment: October 2022 – March 2023.

↗Outcome: Installation work was completed 2 months before the scheduled launch, leaving 2 months for start-up testing and adjustments.
Explore project details

Scope and responsibilities

During installation, I coordinated a team of 5 electricians, allocated tasks and tracked progress. I checked and calibrated instruments, programmed supplementary automation systems and collected data from Mazzoni’s PLCs for supervision.

Installation and verification of power and control systems using Siemens and Schneider Electric equipment. Installation, inspection and calibration of field instruments; coordination with Ballestra and Mazzoni on the main line and auxiliary equipment, including pumps, steam valves and effluent management.

Programming of supplementary automation systems and collection of production PLC data for monitoring and digitalization. Involvement in functional testing, troubleshooting and commissioning.

Outcome — Installation work was completed 2 months before the scheduled launch, leaving 2 months for start-up testing and adjustments.
Coordination · Instrumentation · Programming · Commissioning
02Casablanca · Wastewater treatment plant

Wastewater treatment plant: automation and commissioning.

Automation of Lesieur Cristal’s industrial wastewater treatment plant (WWTP): requirements review, equipment selection, installation coordination, Siemens S7-1500 programming and SCADA development.

↗Outcome: Development and commissioning of the wastewater treatment plant’s automation and SCADA system.
Wastewater treatment plant — Lesieur Cristal
Project photo / document
Explore project details

Scope and responsibilities

Technical ownership from requirements assessment and equipment selection to installation coordination, testing and startup. Complete Siemens S7-1500 programming and SCADA development for process control, monitoring and visualization.

The treatment process includes oil separation, pH adjustment using acid or caustic dosing, biological aeration and settling. Instrument checks and control sequence tuning during functional tests.

Published plant context: Lesieur Cristal reported a capacity of 1,500 m³/day in 2019 and a 40% extension of biological treatment capacity. These figures refer to the facility, not to performance gains attributable to this assignment.

Outcome — Development and commissioning of the wastewater treatment plant’s automation and SCADA system.
Siemens S7-1500 · SCADA · Wastewater treatment plant · Commissioning
03Casablanca · Liquid soaps and shampoos · 2018

Complete automation of the preparation lines — 2018.

Full automation of 2 liquid soap preparation lines in 2018 as part of a new personal-care workshop that also included a shampoo packaging line.

↗Outcome: Complete automation of 2 preparation lines as part of the modernization of personal-care operations in 2018.
Explore project details

Scope and responsibilities

Ownership of the automation scope for both preparation lines, from component selection and installation team coordination through commissioning. Completed 100% of the Siemens S7-1500 programming for the preparation lines and developed the SCADA monitoring system.

Integration of an AS-Interface (AS-i) field network to simplify connections, reduce conventional wiring requirements and support maintenance.

Functional testing, sequence validation, tuning and startup of the preparation lines. The shampoo packaging line is presented as part of the wider workshop, not as an automation scope fully programmed in this assignment.

Outcome — Complete automation of 2 preparation lines as part of the modernization of personal-care operations in 2018.
2018 · 2 preparation lines · Siemens S7-1500 · SCADA · AS-i · Commissioning
04Casablanca · Cartoning

Adapt a cartoning machine for two soap formats.

Modification of an ESQUERDA cartoning machine to package 2 solid soap formats on the same production equipment.

↗Outcome: Expanded machine capability to 2 formats without replacing the entire cartoner.
Omron cartoning machine Ladder program
Project photo / document
Explore project details

Scope and responsibilities

Assessment of the existing machine sequences and changes required for format handling. Development and adaptation of the Omron CQM1 PLC program.

Collaboration with a mechanic handling mechanical modifications, with checks on the interaction between motion, sensors and electrical commands.

Production testing and sequence adjustments to validate both formats.

Outcome — Expanded machine capability to 2 formats without replacing the entire cartoner.
Omron CQM1 · Programmation · Adaptation machine
05Casablanca · Biomass boiler

Make production data visible on the HMI.

Improvement of operational monitoring on an EGFI biomass boiler using, among other fuels, olive pomace.

↗Outcome: Improved visibility into production performance and stoppages through additional HMI functions.
EGFI biomass boiler equipment
Project photo / document
Explore project details

Scope and responsibilities

Analysis of available control data and HMI enhancements to make production indicators easier to access.

Added monitoring of run and stop times, downtime causes, fuel consumption and data used to calculate produced energy.

Organized weekly production reporting for operators and maintenance teams.

Outcome — Improved visibility into production performance and stoppages through additional HMI functions.
EGFI boiler · HMI · Production · Energy tracking
06Refining · HAZOP analysis

Understand the process to assess its risks.

Contribution to a HAZOP study for a crude oil refining unit, with emphasis on the functional analysis of industrial automation.

↗Outcome: Provided automation analysis supporting industrial risk assessment.
Explore project details

Scope and responsibilities

Reviewed existing PLC programs to document control logic, operating sequences and equipment interactions.

Recorded modifications made over time and prepared functional documentation reflecting actual process behavior.

Worked with HAZOP specialists during the review of process deviations, possible causes and preventive safeguards.

Outcome — Provided automation analysis supporting industrial risk assessment.
HAZOP · Functional analysis · Refining process
07Casablanca · Bottle inspection

Modernize bottle inspection before filling.

Upgrade of a MECCANOPLASTICA bottle inspection machine that detects leaks and defects before filling.

↗Outcome: Upgraded Siemens LOGO! PLC, sensors and HMI.
Explore project details

Scope and responsibilities

Assessed the existing control system and replaced the PLC with a Siemens LOGO!, updating the logic and field sensors.

Developed a new human-machine interface (HMI) to improve operation, status monitoring and checks by operators. Performed functional tests and validated the upgraded controls.

Outcome — Coordinated modernization of machine control, sensing and operator interface without replacing the entire machine.
Siemens LOGO! · Sensors · Quality control
08Shawinigan · Industrial dryer

Update the installation and support testing.

Control-system modernization for a wood-strand dryer used in OSB panel production in Shawinigan.

↗Outcome: Contributed to control-system modernization and validation of the upgraded installation.
Explore project details

Scope and responsibilities

Participated in migration from RSLogix 5 to Studio 5000 as part of the control equipment renewal.

Updated electrical drawings, installed replacement modules and checked wiring connections.

Supported functional tests during restart. The dryer handles material coming from Pallmann stranders before further processing into OSB panels.

Outcome — Contributed to control-system modernization and validation of the upgraded installation.
RSLogix 5 · Studio 5000 · Electrical drawings · Testing